I was on the Rapid Transit Citizens Advisory Committee, and we were told by staff and the consulting engineers that the 30% design was sufficient to tender the contract, although maybe the tendering process is staged, or maybe they meant that it was enough to fully cost the project.

In any case, it was the maximum that the province wanted before deciding whether or not to go ahead with the project. In other words, nothing more than the 30% design would be done before deciding the project would actually be built.