Suggestion of an idea (possibly dumb, possibly good):

If the West Harbour switch work is staged simultaneously with the Lewis GO Facility, perhaps split them apart, and get the West Harbour switch work copmleted first.

In exchange, give CN some limited running rights through the GO station (e.g. offpeak, nighttime, when the station is closed to public) so CN won't charge extra for expediting staging (sequence/scheduling of construction) of the "100 meter extension". I'm not sure if this is the right thing to do, or if it will speed things up at all, but it could possibly turn out to be a good quid pro quo.

This could make track shutdowns easier (e.g. John Street bridge rebuild).