By kevlahan (registered) | Posted March 30, 2016 at 19:26:34 in reply to Comment 117350

He means from now until the end of construction. Construction is supposed to start in 2019 and last 3 to 5 years which would take us to 2024 before even considering street changes presumably even those recommended by the rapid transit team.

It is also unclear what "reduce capacity" even means since 2 way conversions could increase capacity and traffic flow will change as downtown becomes more of a destination so does he mean cut through capacity or capacity to reach down town destinations. But Whitehead seems to oppose 2 way conversion on principle.

Comment edited by kevlahan on 2016-03-30 19:37:22